Tender/Pricing Documentation

The design-bid-build method is the most common form of construction tendering/construction pricing used today. This involves the preparation of construction drawings. In most cases, these are then released by you to a select group of general contractors/builders, who will then place a bid on the project which reflects what they believe cost of construction will total. This bid is inclusive of a multitude of subcontractor bids for each specific trade. The general contractor’s fee is generally built into the bid cost.